400 2
months the dolomite was shipped to a crusher at Joplin. Several months ago a crusher was built near the quarry. A switch has been built to the quarry and mill from the main line of the Kansas City Southern railway. A bed four feet in thickness is being developed, after the removal of a layer of soil varying from three to 12 feet in thickness.
Get a Quote